EXAMPLES
Order cases first. Then the other places manual work hides.
These are illustrative case studies, not client claims. They show the type of problem, architecture and before/after measurement Kordelli would use to evaluate a real engagement.
Orders and quotes
Approved order handoff
Re-entry from source into ERP, tracker and notification.
Accepted quote, typed again
The acceptance is matched to the quote, differences are reviewed, the order is created in the ERP.
Beyond order entry
Weekly multi-system report
Downloads, copy/paste, cleanup and consolidation.
Document intake + approval
Download, rename, register, file, route and follow up.
Illustrative numbers are examples of how a business case can be modeled. Actual savings depend on your process volume, exceptions, systems, controls and human review requirements.
CASE 01 · ORDER HANDOFF
The order is approved. Why are we typing it again?
Illustrative, not client results
Before
A sales or procurement order is approved in one system. An employee re-enters customer, item, date and value information into the ERP, updates a tracking spreadsheet, creates a project folder and sends a confirmation to the next team.
Architecture direction
Treat the approved source as the event. Validate mandatory fields, create or update the downstream record through the most reliable supported interface, log the transaction, create the operational workspace and notify the responsible team. Duplicate detection and idempotency prevent the same order from being created twice.
Illustrative business case
At 18 minutes per order and 30 orders/week, the current process consumes about 468 hours/year. Reducing human handling to three minutes per order would release roughly 390 hours/year, before considering fewer re-entry errors.
CASE 02 · QUOTE TO ORDER
The quote is accepted. Then it gets typed again as an order.
Illustrative, not client results
Before
A sales rep builds a quote in a spreadsheet or the CRM and emails it as a PDF. When the customer accepts, often by replying to the email or sending a PO that references the quote, someone re-keys the customer, items, quantities, prices and terms into the ERP as a sales order, checks it against the original quote and tells the sales rep.
Architecture direction
Make the quote the single source of truth. Every quote gets a number and lives where your tools can read it (the CRM, a SharePoint list or the ERP's own quote module). When an acceptance arrives, it is matched to the quote number, the PO lines are compared with the quote, and the sales order is created from the quote data through the most reliable supported interface. Differences in price, quantity or items go to a person. If your ERP already converts quotes to orders, the work is mostly routing and validation, with tools you already own.
Illustrative business case
At 15 minutes per accepted quote and 25 accepted quotes per week, the current process consumes about 325 hours/year. Bringing human handling down to three minutes would release roughly 260 hours/year, before counting pricing errors that reach the invoice.
BEYOND ORDER ENTRY
The same method on other manual processes.
CASE 03 · REPORTING
The report that starts with three downloads.
Illustrative, not client results
Before
An operations coordinator downloads exports from an ERP, a planning system and a SharePoint file every Friday. Columns are cleaned, data is pasted into a master workbook, formulas are checked, exceptions are highlighted and the final report is emailed to stakeholders.
Architecture direction
Use supported connectors or APIs where available, stage the source data, validate schema and required fields, apply deterministic transformations, refresh the reporting dataset and notify the reviewer only when the output is ready or an exception needs attention.
Illustrative business case
If the current cycle takes 3.5 hours and the automated flow reduces human review to 20 minutes, the process releases about 165 hours/year at one weekly cycle. The real project would validate this baseline before build.
CASE 04 · DOCUMENT CONTROL
A PDF arrives. Then the scavenger hunt begins.
Illustrative, not client results
Before
A document arrives by email. Someone downloads it, checks the project number, renames the file, saves it to the correct folder, adds a row to a register, sends an approval request and follows up if nobody responds.
Architecture direction
Capture the attachment from an authorized mailbox, validate metadata, apply naming rules, save to the client-controlled repository, update the register, initiate approval and log each state change. Ambiguous or missing information routes to a human instead of being guessed.
Illustrative business case
At 45 minutes/day, the manual process consumes roughly 195 hours/year. If automation leaves eight minutes of review and exception handling, the released capacity is about 160 hours/year.
YOUR PROCESS
Have one that looks suspiciously familiar?
Show us the real steps and volume. We'll model the opportunity before recommending the build.
Book a free consultation ↗